CCA 61 – 2008 – Risks of Pre-purchasing Equipment and Materials for Construction Projects

Members: $24.00

Non-Members: $36.00

Preview table of contents A guide explaining the costs and risks associated with pre-purchasing equipment and materials, which may outweigh any anticipated economic and scheduling advantage. Format: electronic (downloading requires purchasing a registration number from one of the CCA document outlets)

SKU: CCA61-2008-PDF
Category:

Description

Preview table of contents
A guide explaining the costs and risks associated with pre-purchasing equipment and materials, which may outweigh any anticipated economic and scheduling advantage.

  • Format: electronic (downloading requires purchasing a registration number from one of the CCA document outlets)